Thanks to a new tool we can wind up the sides of the Hoop house
If you haven’t been around Baldwin lately, you need to catch a glimpse of the hoop house which is almost completed. This never would have been accomplished without the efforts of Air International who spent two days constructing it. Being the good engineers that they are, they found a way to improve the structure by having a tool that can wind up the sides. So they went back to the shop and fabricated the tool. Their human resource director tested it out. THANKS AIR INTERNATIONAL!!
Categories: Uncategorized